Risk Based Inspection
The Objective of the Risk Based Inspection (RBI) is to define the inspection planning for controlling the failure risk on the facility. The method “applied for field or platform on onshore or offshore” is to assess the risk of failures and consequences and hence provide suitable actions to prevent or to reduce unacceptable conditions. We used 2 method likes; API 58 BRD used 3 analys data : Qualitative Analysis (Level-1),Semi-Quantitative Analysis (Level-2), and Quantitative Analysis (Level-3) and DNV which analys data using Screening and Detailed Assessments.
