Project Name: ProDBMS Implementation On Onshore Area
Client: PT. ConocoPhillips Indonesia
Implementation: June 2005 - June 2006
Description
In Onshore field, recently, there were two separated data sources. The first one was Microsoft Access version (mdb files) and the other was Oracle (FieldView) version. In Belanak Field there are also two separated data sources, which are Honeywell PHD and VO/VMS. According to this condition, users have separated systems that cannot run simultaneous since ConocoPhillips Indonesia also has Block B Natuna’s production data management. There will be double manual entry on the two-separated system at one management system. The impact of this situation is that user has long delay time to access and report data internally and externally, and furthermore it will take more time to make important and critical decision for engineers.
Concerning Production Database Management System, PT Scada Prima Cipta (herein after called as PT SPC) proposed an integrated data for all area in Onshore and Belanak that may be merged into Block B Natuna. PT SPC will implement ProDBMS which is the powerful and user friendly Production Data Management. In the end, there will be only one system for all ConocoPhillips Indonesia’s field.
The ProDBMS system has many advantage features such as: reduction of time consumption caused by repetitive manual data entry at Grissik field and Belanak, speeding up the availability of the latest production data for the management and enabling the monitoring, evaluation and assessment of the overall asset, and enhancement the validity of production data
Scope of Work
1. PRODBMS Facilities Configuration Set-Up
a. Set-up database (Onshore and Belanak)
b. Configure database (Onshore and Belanak)
c. Configure data transfer scenario to Jakarta database.
d. Data migration
e. Configure each site
f. Set-up default and custom variables
- Well Test
- Well Downtime
- Storage and Lifting
- Pipeline
- Zones Information
g. Create users & roles
h. Configure asset-based security
i. Documentation
2. PRODBMS Custom Reporting
a. Collect all report format
b. Develop custom report
c. Create schedule to upload report to intranet
d. Documentation
3. PRODBMS Validation System.
a. Define necessary data to be validated
b. Develop validation procedure
c. Trial and test validation process
d. Documentation
4. PRODBMS Mass Balance / Gas Accounting System
a. Define necessary data for Allocation
b. Set-up hierarchy for Allocation
c. Configure and/or develop new scenario for Allocation
d. Allocation Process Test and QC
e. Documentation
5. Engineering Documentation
a. Update Document (together along with project)
b. Publish to ConocoPhilips
Application Overview