Project Name: Case Packer S30 & S31 Upgrading Project
Client: PT. HM Sampoerna
Implementation: May 2005 - June 2005

Description

The project was proposed for SKM3 Senzani Case Packer S31, S30 upgrading project in PT HM Sampoerna Tbk. The objectives of this project is to upgrade current 2 units Case Packer S31 and S30 to provide suitable production, performance, downtime data for Level 2 SCADA requirement. 1996’s Senzani S2000 used since 1996 cannot provide suitable production, performance , downtime data for higher level system SCADA, text based operator terminal is not enough to provide operator, production and maintenance team in down time handling and production monitoring

Scope of Work

1. Converting PLC Application
2. Develop PLC Application to provide Production Data
3. Developing PLC Application to provide Performance Data
4. Developing PLC Application to measure material usage
5. Developing PLC Application to manage Down Time
6. Apply off the shelf process control
7. Apply off the shelf Human Machine Interface
8. Bale Identification
9. Case Identification
10. Maintain Case Integrity
11. Provide Object Linking Embedded for Process Control